Costs

Track labour costs precisely, flowing straight into your cost report and payroll software.

Enter hours or import them from your clock-in system, let Coreloops handle rates, breaks, overtime and CIS, then allocate the cost to projects and cost codes.

Subtotal£17,762.50
Deductions£0.00
Gross Total£17,762.50
CIS Amount£0.00
Net Payment£17,762.50
Status Supplier Pay schedule
27th Jul – 2nd Aug 2026
FOFabrication OpClocked 50 HoursPaid hours 50Default rate £98.00 / hrTotal £4,900.00102 - Stripout & Subfloor PrepPending
GWGroundworkerClocked 100 HoursPaid hours 97.5Default rate £35.00 / hrTotal £3,832.50Groundworks ProjectApproved
IOInstaller OpClocked 50 HoursPaid hours 50Default rate £25.00 / hrTotal £1,250.00100 - Site Labour & SupervisionPending

Do you know what labour is costing this job?

Hours arrive in five formats

Paper sheets, WhatsApp messages and clock-in exports all need matching to projects by hand.

Rates, overtime and CIS get miscalculated

Every rate group, break rule and deduction rate is another chance to pay the wrong amount.

Labour never reaches the cost report

Payroll is done, but the hours are not allocated, so the biggest cost on the job is missing from the numbers.

Enter hours or import them

Record clock-in and clock-out per day, or import a CSV or Excel export from your clock-in system. Hours calculate from the times, less breaks, at your rounding interval.

GroundworkerImport hoursTimesheet 2 of 1127th Jul – 2nd Aug 2026
27th Jul 2026Monday
Primary / StandardGroundworks ProjectSelect cost code
06:0018:0012h7h 30m break£35£262.50
Overtime — MondayAuto-generated overtime
Primary / Overtime12£42£504.00
ApprovedInformationHistoryComments
Costs
Subtotal, 97.5 paid hours£3,412.50
Overtime, 12 hrs at £42.00£504.00
VAT, 0%£0.00
CIS deduction, 20%-£783.30
Net payment£3,133.20

Pay, overtime and CIS calculated

Set rate groups, overtime rules, break times and CIS deduction rates once. Coreloops applies them, splits labour from materials, and flags incomplete or impossible clocking entries.

Allocate hours to cost codes

Split a person's week across projects and cost codes, download the payroll report, and see the labour cost appear in the project cost report against the codes it was worked on.

Group By: Project Cost code: 100 Site Labour & SupervisionMonthly
Cost ReportResource ReportTransaction Report
ProjectForecast BudgetPeriod Actual CostsForecast Final CostMargin %
Total£96,480.00£28,237.50£91,614.1512.42%
Groundworks Project£20,880.00£8,750.00£15,951.0132.09%
Riverside Depot, Phase 2£11,400.00£4,900.00£9,845.6013.64%
Northgate Fit-Out£64,296.00£14,587.50£82,511.04-14.07%
Unassigned£0.00£0.00£0.000.00%

Labour, tracked like every other cost

Cut the admin on payroll week

Hours come in once and calculate themselves.

Pay the right amount

Rates, overtime and deductions applied consistently across every operative.

See labour in the cost report

Allocated hours land against cost codes, so the margin includes your largest variable cost.

Testimonials

What the industry is saying

How contractors are taking control of their costs and contracts with Coreloops.

We had CEs there with our approval attached to it. There was no way for the client to dispute it.

SM

Samuel Maddison

Director, Project Safe

The result

£100k

NEC dispute resolved without escalation

Read the case study
Talk to the team

Book a discovery call

We'll learn about your current setup and show you how Coreloops could give you accurate project cost reporting.

✓
30 minutes, on a video call
✓
No prep, nothing to bring
✓
Shown against how you work today
Book a call
Get started with Coreloops today
Join the leading AI-Powered commercial control platform
AI-powered commercial control for construction and rail companies.
1 Giltspur Street,
London, England, EC1A 9DD
hello@coreloops.ai
© 2026 Coreloops UK (GigBridge Ltd). All Rights Reserved.