Costs

One bill of quantities, feeding your budget, applications and margins

Import your BoQ, link each line to a cost code, and it becomes the basis of your budget, your payment applications and your margin, all at once.

SummaryItems
Import BOQ
Forecast Value£750,483.00Original Value £769,983.00
Forecast Budget£600,386.40Original Budget £615,986.40
Forecast Margin£150,096.60Original Margin £153,996.60
Forecast Margin %20.00%Original Margin % 20.00%
SECTION A — PRELIMINARIES
Cost Price £36,400.00Sell Price £45,500.002 cost codesMargin £9,100.00
SECTION B — BULK EARTHWORKS
Cost Price £267,080.00Sell Price £333,850.003 cost codesMargin £66,770.00
Variations
Cost Price £19,170.40Sell Price £23,963.002 cost codesMargin £4,792.60

Does your budget still match the job you're building?

Is the BoQ is retyped into three places?

The tender sheet, the cost report and the application each hold their own copy, and they drift apart within two months.

Do Variations never reach the budget?

The sell value moves but the budget doesn't, so margin is measured against a number that expired at variation three.

Are cost codes not lining up with the bill?

Spend is coded one way and the bill is structured another, so nobody can say what a line has actually cost.

Import the bill once

Bring in your schedule of works or bill of quantities and link each line to a cost code, in your own code structure, groups and categories. It sets the budget and the sell value at the same time.

Add SectionExpand All
SECTION E — TESTING & VALIDATION
Cost Price £18,884.00Sell Price £23,605.002 cost codes
In-situ CBR / plate load testing of formation & capping
Quantity 45Cost Rate £148.00Sell Rate £185.00600 - Testing & Compliance
Zone BClient witnessAdd tag
Topographic survey of finished formation
Quantity 1Cost Price £1,920.00Sell Price £2,400.00500 - Testing & Commissioning
SubcontractAdd tag
VAR/001ApprovedSummaryVariation
Budget - Added£10,769.00
Budget - Omitted-£82,511.00
Budget - Impact-£71,742.00
Value - Added£14,000.00
Value - Omitted-£107,264.30
Value - Impact-£93,264.30
VAR/001  Partitions, wall and ceilings changesCost Price £10,769.00Sell Price £14,000.00Margin £3,231.00
Preparation and decoration of exposed soffit to sales floorNewCost Price £5,538.00Sell Price £7,200.00CC-400 Partitions - Walls & CeilingsSelect custom tag
Suspended MF plasterboard ceiling incl. access panelsNewCost Price £5,231.00Sell Price £6,800.00CC-400 Partitions - Walls & CeilingsSelect custom tag
PRELIM-01Preliminaries & site management allowanceOmittedCost Price -£82,511.00Sell Price -£107,264.30CC-100 Preliminaries & Site Management
Merged into the BoQ on approvalRe-publish to BoQ

Variations merge into live bill the moment they're approved

Additions, omissions and modifications are merged into the BoQ the moment they are approved - sell value, budget and the next application move together, not in three separate edits.

Catching overspend as it happens. Budget against spend, by cost code

Total budget, budget to date and actual spend sit on the same line, in the structure you set up, so the gap is visible per cost code rather than only at project level.

Cost ReportResource ReportTransaction Report
Cost CodeForecast BudgetForecast Final CostMargin %
Total£615,986.40£569,221.256.78%
200 Plant & Equipment£238,848.00£180,844.0932.70%
300 Binders & Materials£235,158.40£244,635.937.53%
400 Haulage & Disposal£64,296.00£82,511.04-14.07%
600 Testing & Compliance£23,764.00£17,658.1133.95%

One structure, used everywhere

Stop retyping the bill

The bill you import is the one your applications and cost report use.

Measure margin against today's sell value

Approved variations are in the bill, so margin reflects the current contract sum.

Code costs the way you price work

Your cost codes, groups and categories, not a structure we imposed.

Testimonials

What the industry is saying

How contractors are taking control of their costs and contracts with Coreloops.

We had CEs there with our approval attached to it. There was no way for the client to dispute it.

SM

Samuel Maddison

Director, Project Safe

The result

£100k

NEC dispute resolved without escalation

Read the case study
Talk to the team

Book a discovery call

We'll learn about your current setup and show you how Coreloops could give you accurate project cost reporting.

✓
30 minutes, on a video call
✓
No prep, nothing to bring
✓
Shown against how you work today
Book a call
Get started with Coreloops today
Join the leading AI-Powered commercial control platform
AI-powered commercial control for construction and rail companies.
1 Giltspur Street,
London, England, EC1A 9DD
hello@coreloops.ai
© 2026 Coreloops UK (GigBridge Ltd). All Rights Reserved.