NEC contract management

Every early warning and compensation event, on time and on record.

Raise early warnings, escalate them to compensation events, price quotations from your rates. Keep your activity schedule and risk register updated in half the time.

app.coreloops.ai/projects/eastfield-depot/compensation-events/CE-002
CE-002 · Additional engineering resource, utility diversions
Eastfield Depot Upgrade · NEC4 ECC Option C · from early warning EW-004 · compared with activity schedule rev. 3
Quotation submitted
Activity
Month
Days
Rate
Total
Utility diversion design
Senior engineer · 12 days scheduled
Aug 26
+10
£520.00
£5,200
Setting out and survey
Site engineer
Aug 26
6
£410.00
£2,460
Setting out and survey
Site engineer
Sep 26
8
£410.00
£3,280
Traffic management
Rate library · from Jul 2026
Sep 26
4
£685.00
£2,740
Quotation total
£13,680
History
Early warning EW-004 issued
04 Aug 2026 · to project manager, cc 2
Escalated to compensation event
11 Aug 2026 · CE-002 created
State changed to Notified
12 Aug 2026 · "Confirmed on site meeting"
Quotation submitted
29 Sep 2026 · £13,680

NEC rewards whoever keeps the better records

Notices that miss the window

A compensation event not notified within eight weeks of becoming aware of it can be lost. Notices drafted in Word and sent from a personal inbox are easy to forget and hard to prove.

Registers kept in spreadsheets

The early warning register lives in one file, the compensation event log in another, and neither matches what was actually issued.

Quotations rebuilt by hand

Every quotation means re-keying people, days and rates against the activity schedule, and double counting time that was already in scope.

From early warning to accepted quotation, in one flow

01 · Early warnings

Raise an early warning in minutes

Choose the reason, record the likely impact on cost, completion and key dates, and pick recipients from your project contacts. Coreloops issues the notice by email with replies coming back to you, or you can download it and send it yourself.

EW-004 · Unrecorded gas main at chainage 240
Reason: physical conditions
Draft
Could affect
Prices
Completion
Key dates
Quality
Issue to
PM
Project manager
pm@client.co.uk
SV
Supervisor
cc
supervisor@client.co.uk
Download
Send notice
Escalate EW-004
Impacts carry over as line items
Raise a new compensation event
Add to an existing event
CE-002
Rates available
Utility diversion design · day
£520.00
Setting out and survey · day
£410.00
Traffic management · day from Jul 2026
£685.00
02 · Compensation events

Escalate to a compensation event without re-keying

Turn an early warning into a new compensation event or add it to one already open. Price the quotation from your rate library, including rates that changed partway through the project, and add lines across several months at once.

03 · Activity schedule

Quote against the activity schedule you agreed

Import your activity schedule or build it in Coreloops. Each compensation event is compared with it, so you can extend, reduce or omit an activity and the quotation shows the change, not a second copy of work already in scope.

Activity schedule rev. 3 · working days
Activity
Aug
Sep
Oct
Nov
Utility diversion design
1222
20
20
18
Setting out and survey
16
20
200
180
Traffic management
—
+4
—
—
Extended
Reduced or omitted
Early warning register
PDF
Excel
EW-001 · Late access to compound
Issued 02 Jul 2026 · 3 recipients
Closed
EW-003 · Revised drainage design
Issued 21 Jul 2026 · next meeting 14 Oct
Open
EW-004 · Unrecorded gas main
Escalated to CE-002
Escalated
04 · Registers and history

A record you can stand behind in a dispute

Registers are generated from what was actually issued, as PDF or Excel, with recipients and distribution listed. Each status change on a compensation event is stored with its effective date and note, so you can show who was told what and when.

Why commercial teams run their NEC contracts on Coreloops

One place for every notice

Early warnings, compensation events and their registers sit on the project, next to the BOQ and payment applications.

Quotations priced consistently

Rates come from your library and the activity schedule, so two people pricing the same event get the same number.

Ready for the final account

Accepted compensation events flow into the contract value, so the final account reflects what was agreed.

Testimonials

What the industry is saying

How contractors are taking control of their costs and contracts with Coreloops.

We had CEs there with our approval attached to it. There was no way for the client to dispute it.

SM

Samuel Maddison

Director, Project Safe

The result

£100k

NEC dispute resolved without escalation

Read the case study
Talk to the team

Book a discovery call

We'll learn how you manage NEC contracts today and show you how Coreloops could run your early warnings, compensation events and activity schedule.

✓
30 minutes, on a video call
✓
No prep, nothing to bring
✓
Shown against how you work today
Book a call
AI-powered commercial control for construction and rail companies.
1 Giltspur Street,
London, England, EC1A 9DD
hello@coreloops.ai
© 2026 Coreloops UK (GigBridge Ltd). All Rights Reserved.